2004 Construction Program

[ 2009 | 2008 | 2007 | 2006 | 2005 | 2004 | 2003 | 2002 | Index ]


Project: STP-S-C082(30)--5E-82
Location: Scott Park Road (Old Highway 61) from 210th St (F55) to the Scott County Line
Status: Completed
Construction Time: 103 days
Project Cost: $3,300,621.82
Contractor: Mathy Construction Co.

Description: Construction will include Rubblizing the existing concrete surface, recycling the existing asphalt surface, placing a 7inch asphalt overlay and new rock shoulders. Road will be open to traffic, although traffic will be controlled by pilot car, expect delays. Letting on February 17, 2004. Construction will be done in conjunction with construction on St Ann's Road and McCausland Road. The combined projects should take most of the summer to complete.

Old 61 and LeClaire road Old 61 and LeClaire road 2 Old 61 area to patch Old 61 area to patch 2 Old 61 areas to mill Old 61 diamond grinding Old 61 diamond grinding 2 Old 61 diamond grinding 3 Old 61 diamond grinding 4 Old 61 diamond grinding 5 Old 61 faulted pavement Old 61 ground pavement Old 61 milling Old 61 milling 1 Old 61 milling 2 Old 61 milling 3 Old 61 milling 4 Old 61 milling 5 Old 61 patches Old 61 patches 2 Old 61 to be recycled Old 61 to be recycled 2 Old 61 to be recycled 3 Old 61 typical broken pavement

2004 Projects: